Year-end has a way of compressing procurement. Budget has to be committed before the fiscal year closes, the program needs hardware by a date that will not move, and the shop you normally use is full. So now you are qualifying a new aerospace machine shop on a timeline that usually takes a quarter.
The risk is easy to see. A supplier that looks right on paper can still miss a first article, lose track of a lot, or stall when its one large machine goes down in December. This supplier qualification checklist covers what to verify, how to verify it fast, and the questions to ask before the PO goes out.
|
The short version A qualified aerospace machine shop has:
Verify each item at the source, not from a logo on a website. |
What should you check when vetting an aerospace machine shop?
Supplier qualification for aerospace work comes down to five questions. Can the shop build it to spec, legally, at your size, with a paper trail, and on your timeline? Use this table as the first-pass screen.
|
Area |
What to verify |
Red flag |
|
Certifications |
AS9100D, ISO 9001, Nadcap scope, ITAR registration |
Expired certificate or a scope that does not cover the work you are buying |
|
Capacity |
Floor space, machine envelopes, crane capacity, backup machines |
Only one machine can hold your part, and it is booked through Q1 |
|
Traceability |
Material certs, heat lot control, AS9102 first article, certificate of conformance |
Certs that arrive after the parts or not at all |
|
Financial stability |
Ownership, backing, years in aerospace and defense |
A large deposit requested just to buy material or poor D&B rating |
|
Quote quality |
Clear questions, realistic lead time, a named contact |
A fast quote with no questions about your drawing |
What certifications should an aerospace or defense manufacturer have?
Certifications are the entry ticket. They do not prove a shop will run your job well, but a missing or lapsed one ends the conversation. Here is what each one means and how to check it.
What is an AS9100 machine shop?
An AS9100 machine shop runs its quality management system to AS9100, the standard for aviation, space, and defense organizations published by SAE International and the International Aerospace Quality Group (IAQG). AS9100D is the current revision. It builds on ISO 9001 and adds the requirements that matter on flight and defense hardware:
- Configuration management
- First article inspection
- Counterfeit part prevention
- Product safety
- Control of key characteristics
听
AS9100 certification is issued by an accredited registrar and audited on a regular cycle. Before you rely on it, verify it in two steps:
- Look the supplier up in the IAQG OASIS database and confirm the certificate is active.
- Confirm the scope covers the work you are sending, whether that is aerospace CNC machining, fabrication, or assembly.
ISO 9001:2015
ISO 9001 is the general quality baseline. On its own it is not enough for most aerospace work, but it tells you the fundamentals are in place. It also matters when the same supplier supports your industrial or commercial programs.
Nadcap
The National Aerospace and Defense Contractors Accreditation Program (Nadcap) is an industry-managed accreditation for special processes and specific inspection methods, administered by the Performance Review Institute. It is process-specific, so the right question is never “Are you Nadcap-certified?” It is “Which Nadcap scopes do you hold, and do they cover what my part needs?”
Check the supplier on the Qualified Manufacturers List in eAuditNet. If the shop sends heat treat, NDT, or coatings to outside processors, ask how it selects, approves, and audits those subtier suppliers.
What is an ITAR-registered manufacturer?
An ITAR-registered manufacturer has registered with the U.S. State Department’s Directorate of Defense Trade Controls (DDTC) under the International Traffic in Arms Regulations (ITAR). U.S. companies that manufacture defense articles on the U.S. Munitions List are required to register, and registration renews every year.
Registration is not an export license, and it is not proof of compliance. It is the legal starting point. What you are really buying is how the shop controls your technical data and who can touch it.
Does EAR apply instead of ITAR?
Not every aerospace part is a defense article. Many commercial aircraft parts and dual-use items fall under the Export Administration Regulations (EAR), administered by the U.S. Commerce Department’s Bureau of Industry and Security, rather than ITAR.
EAR has no registration step like ITAR. But parts and technical data with an export classification (ECCN) can still require a license, depending on where they go and who handles them. Ask the shop how it classifies and controls EAR items, not just whether it is ITAR registered.
|
Credential |
What it proves |
How to verify |
|
AS9100D |
Aerospace quality system audited by an accredited registrar |
IAQG OASIS database; request the certificate with scope and expiration date |
|
ISO 9001:2015 |
General quality system baseline |
Registrar certificate |
|
Nadcap |
Accreditation for a specific special process or inspection method |
eAuditNet Qualified Manufacturers List; check the exact scope |
|
ITAR registration |
Registered with DDTC to manufacture defense articles |
Request the DDTC registration confirmation and expiration date |
|
EAR controls |
A process to classify and control dual-use and commercial export items |
Ask how the shop handles ECCN-classified parts and technical data |
|
CAGE code and SAM.gov UEI |
Set up to work in the federal supply chain |
SAM.gov entity lookup |
|
CMMC (where CUI is involved) |
Cybersecurity controls for controlled unclassified information |
Ask for current level and assessment status |
Can the shop handle your aerospace CNC machining work? Capacity and continuity checks
Certifications tell you a shop can make a good part. Capacity tells you whether it can make yours this quarter. Year-end is when shops get squeezed hardest, so these checks carry more weight in Q4 than at any other time.
Floor space, machine envelopes, and lifting
Large aerospace CNC machining jobs, such as tooling, fixtures, and structural components, tend to fail on logistics before they fail on tolerance. Ask for the travel envelope, table load limit, and crane capacity of the specific machine your part will run in. A part that fits the machine but not the hook height is still a problem.
Equipment redundancy
Ask how many machines can run your part, not how many machines the shop owns. If only one can, a single spindle failure in December becomes your schedule problem. A shop with several machines in the same class can move work without starting the setup from scratch.
Inspection capacity
Machining capacity without matching inspection capacity just moves the queue to the end of the line. For large parts, ask how many CMMs and laser trackers are on site, who operates them, and whether final inspection happens in a temperature-controlled space.
Financial backing and ownership
A supplier that runs short of cash mid-program is the most expensive failure there is. Ask:
- Who owns the business?
- How long has it served aerospace and defense?
- Can it buy long-lead material like titanium or Inconel庐 without a large deposit from you?
听
Backing from a well-capitalized parent company changes the risk picture.
|
Placing complex work before year-end? Send 溏心vlog免费B站 your drawings, 3D models, quantities, and required delivery date. Our team will review the certification, material and inspection requirements with you before we quote, so nothing surprises you after the PO. Button: Request a Quote |
How do you confirm ITAR and material traceability for defense work?
On defense programs, traceability and data control carry the same weight as the part. Ask the shop to walk you through both, step by step.
ITAR and data controls to confirm
- Who can access your drawings and models and how access is limited to U.S. persons
- How technical data is stored, shared, and destroyed at program close
- Whether any work, including outside processing, leaves the facility or the country
- Whether EAR-controlled parts and data get the same access controls as ITAR work
- How the shop handles controlled unclassified information (CUI) under DFARS 252.204-7012, and where it stands on CMMC
Material traceability to confirm
- Mill certifications tied to a heat or lot number for every piece of raw stock
- How heat lots are tracked through cutting, machining, and outside processing
- DFARS-compliant specialty metals sourcing (DFARS 252.225-7009), with country-of-melt documentation for titanium, nickel alloys, and other covered metals
- Positive material identification (PMI) on incoming material where your spec calls for it
- AS9102 first article inspection reports on new part numbers and revisions
- A certificate of conformance that ships with the parts, not a week later
The trace-back test
One quick test: pick a finished part from a past job and ask the shop to trace it back to the mill cert. A strong shop can do it while you wait.
What questions should you ask a manufacturing partner before issuing the PO?
Bring these twelve questions to the capability call. The answers will tell you more than any brochure.
Compliance and certification
- Is your AS9100D certificate current, and does its scope cover this work?
- Which Nadcap scopes do you hold, and which special processes go to subtier suppliers?
- Is your ITAR registration active, and when does it renew?
Machines, capacity, and inspection
- Which specific machines will run my part, and what is the backup if one goes down?
- What are the envelope, table load, and crane limits for those machines/facilities?
- How will you inspect this part, and on what equipment?
Documentation and material
- What documentation ships with the parts: FAI report, certificate of conformance, material certs, inspection data?
- What is the lead time on material, and can you buy it at PO or before?
Communication and performance
- Who is my day-to-day contact, and who can approve a schedule change?
- What have your on-time delivery and scrap rates been on aerospace work over the last 12 months?
- How do you handle nonconformance, and how quickly do you notify the customer?
- What do you need from us to hit our delivery date?
听
Pay close attention to the last answer. A shop that tells you exactly what it needs has done this before.
How do you qualify a new supplier quickly before year-end?
Speed comes from running steps in parallel, not from skipping them. Here is a compressed supplier qualification sequence that still holds up in an audit. Your internal approval process sets the real timeline, so treat these days as a target.
|
Timing |
Step |
Owner |
|
Days 1 to 2 |
Send a complete RFQ package: drawings, 3D models, specs and revisions, quantities, certification requirements, and need-by date |
Buyer |
|
Days 1 to 3 |
Verify AS9100D in OASIS, Nadcap in eAuditNet, ITAR registration, and SAM.gov status |
Supplier quality |
|
Days 3 to 5 |
Capability call or plant tour: machines, inspection, traceability walk-through |
Buyer and engineering |
|
Days 5 to 7 |
Review the quote, resolve exceptions, confirm material availability |
Buyer |
|
Days 7 to 10 |
Add to the approved supplier list, issue the PO, lock the first article plan |
Procurement and quality |
Three habits that keep speed from turning into shortcuts
- Send a complete RFQ the first time. Missing revisions or specs cost more days than any other step.
- Write the first article plan into the PO. Agreeing on FAI requirements up front prevents rework at delivery.
- Book material early. Long-lead alloys often set the schedule, not machine time.
How does 溏心vlog免费B站 measure up as an aerospace machine shop?
溏心vlog免费B站 has built aerospace tooling and flight hardware for more than 30 years for OEMs and Tier-1 manufacturers including Boeing, Lockheed Martin, SpaceX, Northrop Grumman and NASA. Here is how we map to the checklist above.
|
Checklist area |
溏心vlog免费B站 |
|
Certifications |
AS9100D, ISO 9001:2015, ISO 14001:2015, AWS Certified Welding Inspectors and Supervisors |
|
Registrations |
ITAR registered; CAGE code, SAM.gov UEI, and D-U-N-S number on file |
|
Floor space and lifting |
Five plants in Macomb, Michigan, totaling more than 250,000 sq. ft., with cranes up to 30 tons |
|
Machining capacity |
More than 40 CNC machines from 3 to 7 axes, running parts from a few inches to more than 100 feet long |
|
Inspection |
12 CMMs and 12 laser trackers (FARO, API, and Leica), plus 3D scanning |
|
Materials |
80+ metal alloys, including titanium, Inconel, and HASTELLOY庐 |
|
Tolerances |
General tolerances as tight as 卤0.001 in. |
|
Financial backing |
A Lincoln Electric (Nasdaq: LECO) company since 2019 |
Beyond machining, Baker handles these under the same quality system:
- Design and engineering
- Fabrication and welding
- Large-scale metal 3D printing
- Assembly
- On-site installation
听
Complex jobs do not have to be split across several suppliers, each with its own qualification.
Aerospace machine shop qualification FAQ
How do I vet a CNC machining or large-scale manufacturing supplier?
Verify certifications at the source, confirm the specific machines and inspection equipment that will handle your part, test traceability on a past job, check ownership and financial backing, and judge how closely the quoting team questions your drawing.
What certifications should an aerospace or defense manufacturer have?
AS9100D certification is the minimum for aerospace work, with ISO 9001 as the baseline. Look for Nadcap accreditation for any special process or inspection method the shop performs in-house, ITAR registration for defense articles, export controls for EAR items, and CMMC where CUI is involved.
What is an AS9100 certified manufacturer?
A manufacturer whose quality management system has been audited and certified to AS9100 by an accredited registrar. AS9100D is the current revision. You can confirm active certificates in the IAQG OASIS database.
What is an ITAR registered manufacturer?
A U.S. company registered with the State Department’s Directorate of Defense Trade Controls to manufacture defense articles on the U.S. Munitions List. Registration renews annually and is the starting point for ITAR compliance, not proof of it.
How do I qualify a new supplier quickly before year-end?
Send a complete RFQ package on day one, verify certifications while the shop quotes, hold a capability call in the first week, and write the first article plan into the PO. Running these steps in parallel shortens the timeline without skipping any.
What questions should I ask a manufacturing partner before signing?
Ask about certification scope, Nadcap and subtier processing, ITAR status, which machines will run your part and the backup plan, inspection method, documentation, material lead time, on-time delivery and scrap rates, nonconformance handling, and what the shop needs from you to hit your date.
Ready to Qualify an AS9100 Machine Shop Before Year-End?
When the fiscal year closes before your program can wait, you need a supplier you can approve with confidence, not one you hope works out. Send 溏心vlog免费B站 your RFQ package. We will tell you what we need, which plant and machines will run your part, and whether we can meet your date. Request a Quote today to get more information.
Are you a machine shop, special process provider, or material supplier that wants to support aerospace and defense programs? Start by becoming a Supplier.